Wiegand spring weir - References

Since 2007, the spring weir has been distributed by the Josef Wiegand company and is now represented in several countries, which is not least due to the constant improvement and further development. 
Particularly outstanding is the large number of different application

possibilities with or without connection to a water power system. The following reference list gives you an overview of the numerous locations of our weir.

Our references in detail

Select the desired country in the drop-down list

Achslach

Carrier: Holz Ebner GmbH
Year of construction: 2018
Length: 5 ,
Water storage level: 70 cm
+ Show on map

Augsburg

Carrier: Fabrikkanal Kraftwerk GmbH & Co. KG
Year of construction: 2022
Length: 27 m
Water storage level: 0,90 m
+ Show on map

Bad Dürrenberg

Carrier: Wehr/Schleuse Bad Dürrenberg
Year of construction: 2019
Length: 45 m
Water storage level: 70 cm
+ Show on map

Berchtesgaden

Carrier: Wasserkraftanlage Gartenau
Year of construction: 2022
Length: 15 m
Water storage level: 0,65 m
+ Show on map

Brennet

Carrier: Kleinkraftwerk Brennet
Year of construction: 2019
Length: 9 m
Water storage level: 50 cm
+ Show on map

Dingelstädt

Carrier: Ernst und Herwig Hoch und Tiefbau GmbH & Co. KG, 37327 Leinefelde
Year of construction: 2010
Length: 3 m
Water storage level: 50 cm
+ Show on map

Freyburg

Carrier: Wasserkraftwerk Burgmühle
Year of construction: 2015
Additional info: Increasing the 80 m long spring weir of 15 cm
+ Show on map

Grunau

Carrier: Betreiberverein Wasserkraftanlage Grunau e. V., 99423 Weimar
Year of construction: 2014
Length: 18,5 m
Water storage level: 50 cm
+ Show on map

Hausach

Carrier: Bezirksstelle Hausach, 77756 Hausach
Year of construction: 2012
Length: 25 m
Water storage level: 65 cm
+ Show on map

Jeßnitz

Carrier: Libelle Wasserkraft und Vermietung GmbH
Year of construction: 2018
Length: 4,8 m + 5,9 m
Water storage level: 45 cm
+ Show on map

Meschede

Carrier: AMC Energie GmbH
Year of construction: 2016
Length: 26 m
Water storage level: 70 cm
+ Show on map

Michelbach

Carrier: Wasserradanlage, 77787 Michelbach a. d. Nordrach
Year of construction: 2014
Length: 8 m
Water storage level: 60 cm
+ Show on map

Münstertal

Carrier: Firma Mutterer
Year of construction: 2016
Length: 7,9 m
Water storage level: 70 cm
+ Show on map

Neumühle

Carrier: WKA Neumühle, 88239 Wangen
Year of construction: 2014
Length: 29 m
Water storage level: 56 cm
+ Show on map

Öblitz

Carrier: WKA Öblitz GmbH & Co. KG
Year of construction: 2016/2017
Length: 78 m
Water storage level: 70 cm
+ Show on map

Offenburg

Carrier: Wasserkraftanlage Großer Deich Offenburg, 77656 Offenburg
Year of construction: 2012
Length: 57 m
Water storage level: 60 cm
+ Show on map

Rappenberghalde Tübingen

Carrier: WKA Rappenberghalde, 77656 Offenburg
Year of construction: 2013
Length: 3 m
Water storage level: 60 cm
+ Show on map

Rothenburg a. d. Saale

Carrier: Wasserkraftwerk Rothenburg, 06420 Rothenburg
Year of construction: 2007
Length: 164 m
Water storage level: 50 cm
+ Show on map

Schlechtau

Carrier: Wasserkraftwerke Murg Breitwies Schlechtau GmbH & Co. KG
Year of construction: 2018
Length: 16 m
Water storage level: 70 cm
+ Show on map

Schwäbisch Gmünd

Carrier: 2015
Year of construction: 2015
Length: 13 m
+ Show on map

Thale

Carrier: Seilbahn Thale GmbH, 06502 Thale
Year of construction: 2007
Length: 35 m
Water storage level: 50 cm
+ Show on map

Weihermühle

Carrier: Goppold Bau GmbH
Year of construction: 2018
Length: 3 m
Water storage level: 50 cm
+ Show on map

Wittlingen

Carrier: SKN Sebastian Kaltenbach Naturenergie, 79599 Wittlingen
Year of construction: 2014
Length: 11 m
Water storage level: 55 cm
+ Show on map

Other attractions